Just in time for the start of the school year, repaving crews are all over main campus. Below is a list of repaving projects, courtesy of COD’s facilities department.

• Aug. 1 through Aug. 14 – Concrete repairs along Tallgrass and at intersection near SSC, between Fawell Lot B and C. Refer to Green area on attached map.
• Aug. 4 through Aug. 6 – Asphalt sealcoating along eastern half of College Road. Refer to Yellow area on attached map.
• Aug. 6 through Aug. 7 – Asphalt sealcoating along western half of College Road and southern section of Prairie Drive, near the staff lot. Refer to Light Blue area on attached map.
• Aug. 9 through Aug. 10 – Asphalt sealcoating along southern section of Prairie Drive, from intersection of Tallgrass and Prairie going south to just before the staff lot. Refer to Dark Blue area on attached map.
• Aug. 11 through Aug. 14 – Asphalt sealcoating of College Lot 1A, eastern section of College Lot 1 and College Lot 5. Refer to Orange (Salmon) areas on attached map.
• Aug. 16 through Aug. 17 – Asphalt sealcoating of Fawell entrances between Fawell Lot A, B, C and D and the entrance off of Lambert Road at Tallgrass Road. Refer to Pink areas on attached map.
• Dates TBD – Red areas on the map are other areas requiring attention; updates will come at a later date.

Public transportation is also affected by the repaving projects.
• PACE Bus, Aug. 1 through Aug. 17 – The PACE Bus stops along Tallgrass Road will not be available. Bus stops will be relocated to two locations off of Fawell, between Lot A and B and between Lot C and D. Refer to map for locations.